New UK Headquarters for Alltech
Project Details
- Client: Alltech
- Category: Commercial
Alltech chose our beautiful limestone for their new UK headquarters which is set to house conferencing space, private function terraces, a pub and a museum displaying Stamford’s heritage.
The principal Contractor for the project was John Paul Construction, who demolished the existing building, cleared the site and erected a two-story structural steel frame before adding the front façade, clad in our locally sourced stone.
This front façade will be clad in our Clipsham limestone, sourced from a quarry less than ten miles from the site, guaranteeing consistency within the local area and ticking lots of boxes for sustainability and local provenance.